Penmann has completed a tailored HVAC upgrade at Nutricia’s Liverpool facility, supplying a fully engineered ventilation and climate control system engineered to meet stringent hygiene and production criteria. The contract included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based https://one-bookmark.com/story20590070/penmann-ltd-finalises-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-to-align-with-the-fsi-development-programme