The plans also include a huge battery at the positioning, to ensure excess ability is often saved for the night, and a 220 kV transmission line that can link the undertaking for the North Star sub-station, in the vicinity of where a new one hundred MW solar challenge can also https://citypointsolar.com.au/blog/