The very first park includes a ability of 200 MW even though Sandrini II provides a ability of a hundred MW. The total price of both equally assignments were not disclosed even so, in the course of building, over two hundred personnel ended up employed. The assignments are predicted to https://california-solar-contractors.my-free.website/